GTS-220 series
TOPCON proudly announces the debut GTS-220 Series as the innovative successor to the best selling GTS-210 Series Total Stations.
The GTS-210 Series with "Waterproof" design brought revolution to the surveying industry with features and durability.
Now the new GTS-220 Series has up-graded its basic functions for distance and angle measurement in addition to maintaining superb durability against the environment.
The GTS-220 Series is also provided with a longer life battery of 10 hours, and various kinds of application programs makes surveying work quick and simple in the field.
The features included with the "All Weather" highly productive GTS-220 Series Total Stations are setting a new standard for surveying!
Model Name | GTS-223 | GTS-225 | GTS-226 | GTS-229 | ||||
TELESCOPE
| ||||||||
Length
| 150mm | |||||||
Objective Lens Diameter
| 45mm (EDM 50mm) | |||||||
Magnification
| 30 × | |||||||
Image
| Erect | |||||||
Field of View
| 1°30′ | |||||||
Resolving Power
| 2.5″ | |||||||
Minimum Focus Distance
| 1.3m | |||||||
DISTANCE MEASUREMENT
| ||||||||
Condition 1
1 prism
3 prisms
9 prisms
| 3,000m (9,900ft) 4,000m (13,200ft) 5,000m (16,400ft) | 2,000m (6,600ft) 2,700m (8,900ft) 3,400m (11,200ft) | ||||||
Condition 2
1 prism
3 prisms
9 prisms
| 3,500m (11,500ft) 4,700m (15,400ft) 5,800m (19,000ft) | 2,300m (7,500ft) 3,100m (10,200ft) 4,000m (13,200ft) | ||||||
| ||||||||
Accuracy
| ±(2mm + 2ppm× D)m.s.e. | ±(3mm + 3ppm× D)m.s.e. | ||||||
D: Measuring distance (mm) | ||||||||
Least Count in Measurement
| ||||||||
Fine Mode
| 1mm (0.005 ft.)/0.2mm (0.001 ft.) | |||||||
Coarse Mode
| 10mm (0.02 ft.)/1mm (0.005 ft.) | |||||||
Tracking Mode
| 10mm (0.02 ft.) | |||||||
Measurement Display
| 11 digits: max. display 9999999.9999 | |||||||
Measuring Time
| ||||||||
Fine Mode
Coarse Mode
Tracking Mode
| 1mm: 1.2sec. (Initial 4 sec.) 0.2mm: 2.8sec. (Initial 5 sec.) 0.7sec. (Initial 3 sec.) 0.4sec. (Initial 3 sec.) (The initial time will be different by a condition and setting EDH off time.) | |||||||
Atmospheric Correction Range
| -999.9 to +999.9ppm (By 0.1ppm) | |||||||
Prism Constant Correction Range
| -99.9 to +99.9mm (By 0.1mm) | |||||||
ANGLE MEASUREMENT
| ||||||||
Method
| Absolute Reading | |||||||
Detecting System
| H: 2 sides V: 1 side | H: 1 side V: 1 side | ||||||
Minimum Reading
| 1″/5″ (0.2 / 1mgon) | 5″/10″ (1 / 2mgon) | ||||||
Accuracy *
| 3″ (1mgon) | 5″ (1.5mgon) | 6″ (1.8mgon) | 9″ (2.7mgon) | ||||
Measuring Time
| Less than 0.3 sec. | |||||||
Diameter of circle
| 71mm | |||||||
DISPLAY
| ||||||||
Display Unit
| Dot matrix LCD 20 characters × 4 lines with Blacklight | |||||||
2sides | 1side | |||||||
Keyboard
| 10 function keys | |||||||
TILT CORRECTION (AUTOMATIC INDEX)
| ||||||||
Tilt sensor
| Dual axis | Single axis | ||||||
Method
| Liquid type | |||||||
Compensating range
| ±3′ | |||||||
Correction unit
| 1″ (0.1 mgon) | |||||||
OTHERS
| ||||||||
Instrument height
| 176mm(6.93in) | |||||||
LEVEL SENSITIVITY
| ||||||||
Circular level
| 10′ / 2mm | |||||||
Plate level
| 30″ / 2mm | 40″ / 2mm | ||||||
LASER PLUMMET : STANDARD
| ||||||||
OPTICAL PLUMMET TELESCOPE (OPTION)
| ||||||||
Magnification
| 3 × | |||||||
Focusing Range
| 0.5m to infinity | |||||||
Image
| Erect | |||||||
Field of view
(at 1.3m)
| 5°(dia.114mm) | |||||||
DIMENSIONS
| ||||||||
336(H) × 184(W) × 150(L)mm [13.2(H) × 7.2(W) × 5.9(L)in.] | ||||||||
Weight
| ||||||||
Instrument
(with battery)
| 4.9kg (10.8 lbs.) | |||||||
Plastic carryng case
| 3.2kg (7.1 lbs.) | |||||||
DURABILITY
| ||||||||
Water protection
| IPX 6 (with BT-52QA) | |||||||
Ambient temperature range
| -20°C to +50°C (-4°F to +122°F) | |||||||
BATTERY BT-52QA
| ||||||||
Output voltage
| 7.2V | |||||||
Capacity
| 2.7AH (Ni-MH) | |||||||
Maximum operating time at +20°C(+68°F)
| ||||||||
Including distance measurement
| 10 hours (12,000 points) | |||||||
Angle measurement only
| 45 hours | |||||||
Weight
| 0.3kg (0.7 lbs.) | |||||||
BATTERY CHARGER BC-27BR / 27CR
| ||||||||
Input Voltage
| AC120(BC-27BR) AC230(BC-27CR) | |||||||
Frequency
| 50 / 60Hz | |||||||
Recharging Time
(at +20°C/+68°F)
| 1.8 hours | |||||||
Operating temperature
| +10°C to +40°C (+50°F to +104°F) | |||||||
Weight
| 0.5kg (1.1 lbs.) |
Sabtu, 19 Januari 2013
Selamat Tahun baru 2013
Kami daripada team 'myukur' ingin mengambil kesempatan ini untuk mengucapkan selamat tahun baru 2013 kepada anda semua pengunjung setia laman myukur.blogspot. Sudah tentu setiap daripada kita telah meletakkan satu azam baru yang besar dalam hidup kita sempena menjelang tahun baru 2013.
Kami doakan agar kesihatan kita semua akan lebih bertambah baik, bisnes semakin berjaya, rezeki semakin luas, pemikiran semakin bijak, pekerjaan semakin cemerlang, Semoga pada tahun 2013 ini kita akan lebih sukses lagi berbanding pada tahun-tahun yang telah lepas. Tuhan Memberkati kita semua Amen!
Salam Sukses untuk semua....
Ahad, 4 November 2012
Monumen Tukang Sukat
Statue in front of the Texas Ranger Hall of Fame. The surveyor was George Erath, and today, there is a geocache monument at the statue.
Surveyor at RRCC in Winnipeg
Statue of Famous Japanese Surveyor Ino Tadataka
Parley overlooking Parley's Canyon
Young Surveyor Washington
Survey statue along SH 289 in Frisco
Survey Statue of Abraham Lincoln in New Salem
Surveyor at Rainfurly
Statue of Thomas Jefferson at University of Virginia
Traffic Circle Surveyor Dawson Creek Canada
Surveyor Adrian Antonisz in Netherlands
Apparently the statue of Blind Jack from Knaresborough England.
He was a blind surveyor and engineer.
Captain Vancouver Statue
Khamis, 25 Oktober 2012
Anggaran Luas 1 Ekar Tanah
Cara yang paling mudah menentukan keluasan dalam unit ekar. Berikut merupakan anggaran tepat keluasan untuk satu (1) ekar. Keluasan 1 ekar sama dengan keluasan 1 padang bola sepak yang memiliki ukuran 90m X 45m.
Ukuran Padang Bola Sepak (Segi empat Tepat)
Ukuran Padang :
- Panjang : Minimum 90m
- Maksimum : 120m
- Lebar : Minimum 45m
- Maksimum : 90m
Ukuran Padang Pertandingan Antarabangsa:
- Panjang : Minimum 100m
- Maksimum : 110m
- Lebar : Minimum 64m
- Maksimum : 75m
Ukuran Luas:
- 1 Ekar = 0.404686 hektar
- 1 Ekar = 4046.86 meter²
- 1 Hektar = 2.47105 ekar
- 1 Meter ² = 10.7639 kaki²
- 1 Link = 0.201168 meter
- 1 Kaki = 0.3048 meter
- 1 Inci = 0.0254 meter
- 1 Meter = 3.28084 kaki
Selasa, 23 Oktober 2012
Sempadan Antarabangsa
Bertugas di Sempadan Malaysia (Sabah) - Kalimantan Timur (KALTIM)
Kami Menaiki kereta Land Rover untuk sampai ke garisan Sempadan Antarabangsa yang terhampir. Land Rover ini dipandu oleh pemandu terlatih dan berpengalaman luas sedang membawa kami sepasukan ukur melalui bekas jalan lama yang telah ditinggalkan oleh pembalak. Dengan berpandukan Handheld GPS a.k.a Garmin ia banyak membantu kami untuk sampai ke destinasi yang dituju mengikut catatan kedudukan bacaan Latitude dan Longitude (Projection WGS84) yang telah ditetapkan daripada awal perjalanan.
Kami mula mendirikan sebuah khemah ukur untuk dijadikan tempat perlindungan sepanjang melaksanakan kerja-kerja pengukuran sempadan antarabangsa.
Kami perlu menyelesaikan kerja memasang khemah sebelum hari menjadi semakin gelap. Kerana Jika hari sudah gelap dan hari telah pun gelap maka ini merisikokan kelengkapan ukur yang telah kami bawa bersama.
Masa berlalu begitu cepat sekali, kami masih bertungkus-lumus menyempurnakan tugas pertama kami iaitu mendirikan khemah ukur.
Kelihatan dapur muslim (khas untuk rakan kerja beragama Islam yang berada di perbatasan) telah siap sepenuhnya dan sedia untuk digunakan pada bila-bila masa.
Khemah pasukan ukur daripada negara jiran iaitu Indonesia nampaknya juga telah siap sepenuhnya dan yang pasti rakan-rakan ukur KALTIM sedang berehat secukupnya selepas penat sehari suntuk mendirikan khemah ukur.
Ini pula dapur non muslim (khas untuk rakan kerja bukan beragama Islam yang berada di perbatasan). Dapur ini sedia digunakan pada bila-bila masa sahaja.
Akhirnya khemah ukur kami telah berjaya disiapkan tepat pada masa yang ditetapkan iaitu siap sebelum matahari terbenam.
Barang-barang yang dibawa mula dimasukkan ke dalam khemah supaya tidak tercicir apabila diperlukan dimasa akan datang.
Sebahagian barang-barang ukur yang dalam proses dimasukkan ke dalam khemah ukur. Barang-barang yang diketagorikan pentingdan sensitif diletakkan ke dalam kotak besi bertujuan mengurangkan risiko daripada terkena ancaman air hujan atau sebagainya.
Beginilah keadaan didalam khemah ukur kami dan disini saya sedang melakukan susunatur barang di tempat tidur mengikut keselesaan saya dan yang lebih penting tidak menganggu keselesaan tempat tidur rakan-rakan yang lain.
Khemah ini kami namakan ia sebagai 'pejabat' ukur. Dimana disini berlaku aktiviti-aktiviti biasa sama seperti di pejabat. Cuma yang berbeza adalah pejabat tengah hutan dan pejabat tengah bandar.
Semakan data, Hitungan data, compare data, merupakan kerja-kerja yang lazim yang dilakukan sewaktu berada di khemah ukur. Jika ada masa lapang kami akan melakukan aktiviti sendiri seperti jungle treking di kawasan berhampiran sambil 'cuba-cuba' manatau bertembung dengan binatang jinak.
Saya memilih pakaian seperti ini sebelum masuk ke dalam hutan tebal kerana saya berasa cukup selesa dengan pakaian ini ketika bergerak. Stokin panjang (stokin bola) ini juga sesuai digunakan semasa bergerak dalam hutan kerana ia banyak mambantu saya untuk mengurangkan ancaman serangan 'vampire' a.k.a Pacat yang tinggal didalam hutan. Kadang-kala apabila pacat mula menyerang terasa pula gatal dan tidak selesa. Ia sedikit sebanyak boleh menganggu kerja pengukuran dan komunikasi dengan rakan kerja kerana terpaksa me-nyah uruskan makhluk ini daripada terus menerus menghisap darah tanpa kebenaran.
Sedang melihat arah rantis@rintis yang dibuat mengikut arah bearing yang dikehendaki supaya boleh saling tampak daripada stesen ke stesen yang lain.
Kedudukan stesen kini saling tampak @ benampakan apabila terlihat kelibat rakan kerja ukur sedang melakukan clearing di stesen tersebut. Stesen yang saling tampak adalah sangat penting untuk memudahkan ukuran dijalankan tanpa perlu membuat terabas ukur.
Beginilah keadaan hutan kalimantan timur. Masa ini kami berada di bawah bukit. Oleh kerana bentuk muka bumi stesen ini sedikit berbukit maka garisan yang lebih panjang sesuai dibuat. Lagipun kerja merintis pokok tidak terlalu banyak dilakukan. Jimat tenaga.
Bersama dengan pasukan ukur negara jiran Indonesia. Di Indonesia ada sedikit berlainan dengan di Malaysia berkenaan dengan tukang sukat. Kalau di Malaysia tukang sukat ada Jabatan sendiri manakala di Indonesia merekalah tukang sukat dan dalam masa yang sama mereka adalah tentera. Itulah yang sahabat saya Pak Yunus katakan. Di sebelah paling kanan adalah askar pengiring daripada Malaysia yang setia mengiringi kami sepanjang kerja ini dilakukan. Jejaka tampan yang memakai topi berwarna hitam itu pula merupakan wakil pengiring daripada tentera nasional Indonesia (TNI). Mereka sentiasa membawa senjata api dan berwaspada setiap masa manatau berlaku apa-apa ancaman tidak kira daripada binatang buas ataupun terserempak dengan manusia berbahaya.
Data yang diperolehi sewaktu berada di padang perlu dilakukan perbandingan terus dengan pihak jiran supaya tidak berlaku 'error' atau perbezaan data ukuran semasa pengukuran dilaksanakan. Jika didapati keputusan kiraan tidak sama maka ukuran perlu dibaca semula sehinggalah memperolehi keputusan kiraan yang sama. Ini sangat penting agar tidak timbul keraguan berkaitan dengan sempadan antarabangsa kedua-dua negara.
Bergambar dengan trig atau beacon yang sudah lama ditinggalkan. Trig ini telah dibina oleh pengukur yang terdahulu. Stesen trig ini sangat penting dalam bidang ukur. Ia dijadikan rujukan setiap masa oleh tukang sukat.
Langgan:
Catatan (Atom)